Checking that the rectification actually happened

Marked complete and confirmed complete are different events.

Owner Inspections · Austral 2179 · 2026-05-12

In short: Why the second visit is the one that closes items rather than moving them.

The problem with a closed list

Items get ticked in a spreadsheet. Whether the work was done, and done properly, is a separate question.

What a reassessment does

Revisits each earlier item and marks it rectified, partly rectified or outstanding, with a photograph either way.

Where it fits

Frame items get reassessed at lock-up as a matter of course. Handover items get a dedicated visit before settlement.

What we have found

Work reported complete that was part done, and finishing applied over an item without the item being addressed.

The economics

Where the first list ran long, the second visit generally pays for itself in items that would otherwise have quietly closed.

Written by the Owner Inspections team from inspections carried out in Austral. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More defect reports guides for Austral

All guides →

Book a building inspection in Austral

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Austral owners ask about this

Is a reinspection cheaper?

It is, since the scope has already been set. The fee covers confirming rather than finding.

What if items are still open?

They remain logged as open items, dated. That written history is what gives you standing.

When should it happen?

Once the builder says the list is closed. Going earlier produces a report full of work in progress.

Can the builder dispute it?

They can, and each item cites what it fails against, so the discussion stays on the document.