Handover inspection in Austral

The full room by room list, taken while the final payment is still yours.

  • Two to three weeks before your handover date
  • 2 to 3 hours on site
  • Report within 24 hours
Price your Austral inspectionGive us the address and the stage.

Fully licensed & accredited

Stage7 of 7
When to bookTwo to three weeks before your handover date
Time on site2 to 3 hours on site
Inspected againstThe Guide to Standards and Tolerances 2017, the NCC, your contract drawings and inclusions

What is included in a Austral pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Austral builds

The Austral handover list leans outward. Weep holes required, or present but sitting under the 150 mm clearance the standard asks for. Control joints that stop rather than run through. Parapet capping fixed through its top face. Downpipes not connected. Silt pits full of soil. Inside, the recurring ones are downlights hard against insulation and switches sitting inside the zone around a bath, both of which are safety items rather than finish items.

What we find at this stage in Austral

  • Weep holes required, or clearance under 150 mm
  • Control joints not continuous
  • Parapet capping fixed through the top face
  • Downpipes not connected and silt pits full
  • Downlights and switches without required clearances
Roof tile needing repositioning, Austral
Roof tile needing repositioning
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Austral

Annotated findings from Pre-handover (PCI) inspections on Austral builds. Client addresses withheld.

Weep hole required, recorded during a handover inspection in Austral
Weep hole required in the brickwork
Control joint not continuous, recorded during a handover inspection in Austral
Control joint stopping short
Parapet capping fixed from the top, recorded during a handover inspection in Austral
Capping fixed through the top face
Downlight minimum clearance required, recorded during a handover inspection in Austral
Insulation against a downlight

The other stages of a Austral build

  1. Bored piers inspection in Austral1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Austral2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Austral3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Austral4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Austral5FixingAfter mouldings, doors and joinery, before the painter
  6. Waterproofing inspection in Austral6WaterproofingAfter the membrane is applied and before any tile is laid

All construction stage inspections in Austral →

Guides

Construction stage guides for Austral

All guides →

Book a pre-handover (pci) inspection in Austral

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Austral: common questions

Why is 150 mm the number?

It is the clearance the standard asks for between the finished ground and the base of the brickwork, so the wall drains and so there is a visible zone to inspect. Graded and paved surfaces have their own lesser figure, and the report says which applies.

Are downlight clearances really my problem?

They are a fire risk, so yes. Insulation packed against a fitting that needs air around it is exactly the kind of item worth having on the list before you own it.

Roughly a fortnight to three weeks ahead, why?

It gives the builder a working window to rectify and gives you one to verify. Book it later and the list becomes a settlement dispute rather than a job sheet.

Do you go back and confirm the fixes?

Yes. On the return visit each item is logged as complete, partly complete or still open, and that record is what you bring to the handover meeting.

How many items is typical?

Dozens is ordinary on a new build. What you want is the structural versus cosmetic breakdown, which the report provides.

What if an item is disputed?

Every entry names the clause, tolerance or standard it breaches. Where it cannot be settled, NSW Fair Trading's complaint and inspection process comes first, then NCAT.