Frame inspection in Austral

The structure while every bolt, washer and nail plate is still countable.

  • Once frame and trusses are up and the roof is on, before lining
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Austral inspectionGive us the address and the stage.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before lining
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Austral frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Austral builds

Austral frames combine timber with a fair amount of structural steel, and the findings split along that line. On the steel: a column that is not the size or specification on the drawing, a connection built differently to the engineering, bolts and washers missing. On the timber: tie down bolts absent from the bracing, plywood bracing fixings missed, noggings removed or left unsecured. Both halves stop being visible the week the plasterer arrives.

What we find at this stage in Austral

  • Column size or specification not matching the drawing
  • Connection not matching the engineering
  • M10 or M12 tie down bolts missing from bracing
  • Plywood bracing fixings missed
  • Noggings missing, removed or left unsecured
Washer missing at a bolted connection, Austral
Washer missing at a bolted connection
Sample findings

Sample defects found during our frame inspections in Austral

Annotated findings from Frame inspections on Austral builds. Client addresses withheld.

Steel column size and specification not matching the drawing, recorded during a frame inspection in Austral
Column not matching the specification
Connection not matching the engineering, recorded during a frame inspection in Austral
Connection built differently to the detail
M10 and M12 tie down bolt missing, recorded during a frame inspection in Austral
Tie down bolt missing from bracing
Unsecured and removed noggings, recorded during a frame inspection in Austral
Noggings removed and left unsecured

The other stages of a Austral build

  1. Bored piers inspection in Austral1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Austral2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Lock-up (pre-plaster) inspection in Austral4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Austral5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Austral6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Austral7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Austral →

Guides

Construction stage guides for Austral

All guides →

Book a frame inspection in Austral

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Austral: common questions

What does a wrong column size actually mean?

The engineer picked a section for a load. A different section carries a different load. It is not a substitution anyone on site should be making without the engineer agreeing to it in writing.

Why do noggings matter?

They brace the studs against buckling and they give the linings something to fix to. Removed by a following trade to make room for a service, they take both functions with them.

How long does frame stage take?

Two to three hours single storey, more on a double storey where the upper frame, its steel and its tie downs have to be reached safely and photographed.

Will the builder act on it?

Generally yes, because frame items cost little at that moment and a great deal to argue about later. The report gives the supervisor a numbered list with photographs.

Are the frame items revisited?

Yes, at lock-up, and each is marked fixed, partly fixed or outstanding so you have a written record.

What should I send through?

Your lot's engineering, together with its tie down schedule. Without them the report can describe the frame but not confirm it against the design.